Temporary Sidewalk Closure Sandy Beach Road
Temporary Sidewalk Closure, Sandy Beach Road from Celebration Drive to Bayly Street.
Purpose: To facilitate the excavation and construction of the condo tower.
Duration: Monday, January 27, 2025 to Friday, December 12, 2025
View the Closure Notice PDF file (includes location map)
For additional information please contact:
Joe Mitschang
Supervisor, Development Inspections
Engineering Services Department
905.420.4660 ext. 2030
jmitschang@pickering.ca
Service Disruption Line: 1.866.278.9993
pickering.ca
Sign up for City updates
Subscribe to receive City of Pickering updates, news, public notices and more.